![Man in bucket working on substation](https://www.ilbinc.com/wp-content/uploads/2022/05/Garland1-1024x683.jpg)
PROJECT DETAILS
LOCATION: Lancaster, CA
OWNER: RE Garland, LLC
COMPLETED: August 2016
PROJECT DESCRIPTION
This 230-megawatt solar array in Southern California includes nearly 900,000 solar modules, 59,000 feet of fiber and 780 medium-voltage terminations. The 34.5-kV collection system consists of 168 poles with overhead conductors as well as 600 medium-voltage terminations and 110,000 feet of conductor.
LOCATION
Lancaster, CA
CATEGORY
Substation